|
|
Z -- CES - MAU Coil SOL W50S8W26RA003 DUE 09/19/2026 at 10:00AM -06:00 POC Benjamin Taylor, benjamin.c.taylor10.mil@army.mil Roberto Rodriguez-Santiago, roberto.rodriguezsantiago.civ@army.mil
This project modifies existing structural cross members within the Building 16 hangar to improve clearance and operational support. This modification requires the rerouting of adjacent electrical conduit and mechanical piping. Concurrently, the facility’s MAU hydronic coil, which has reached the end of its service life, will be replaced to ensure continued environmental control and energy efficiency.
Place of Performance: Cheyenne WY 82009 Set-Aside: Total Small Business Set-Aside (FAR 19.5) URL: https://sam.gov/opp/263cffa4dd4948ce8d3680b4a632fcb6/view OutreachSystems Article Number: 20260910/PROCURE/0433