Sep 11, 2026 Next

The government contract opportunities enclosed with this email are provided to you by the Nevada APEX Accelerator. This service is provided to our clients as part of government contracting assistance services. This contract opportunity notice is based upon your product/service profile. If you wish to revise your product/service profile or have questions concerning this contract opportunity, please contact the Carson City office at 775-687-9921 or the Las Vegas office at 702-486-3514.



DEPT OF DEFENSE, DEPT OF THE ARMY, W075 ENDIST ALBUQUERQUE, KO CONTRACTING DIVISION, ALBUQUERQUE NM 87109-3435


Y -- Building 463 Breakroom Renovation at Kirtland AFB SOL W912PP26QA039 POC Glenda D. Kohlieber, glenda.d.kohlieber@usace.army.mil, tel:5754796095102

This action was awarded as an 8(a) Sole Source Set-Aside under the authority of section 8(a) of the Small Business Act.

The contractor shall furnish all parts, material, labor, equipment and supervision necessary to complete the work for Building 463 Breakroom Renovation and Entry Repair

  1. Demolition
    1. Contractor must remove existing flooring and rubber wall base.
    2. Contractor must remove existing casework and countertop.
    3. Contractor must remove existing plumbing fixtures and refrigerator.
    4. Contractor must remove existing picnic tables and salvage for reinstallation.
    5. Contractor must remove existing cracked and buckled concrete pads and sidewalks.

  1. Construction
    1. Contractor must provide and install new flooring and rubber wall base.
    2. Contractor must provide and install new plastic laminate casework.
    3. Contractor must provide and install new solid surface countertops.
    4. Contractor must provide and install new plumbing fixtures.
    5. Contractor must provide and install new microwave.
    6. Contractor must provide and install new refrigerator.
    7. Contractor must provide and install new refrigerator in Building 442 kitchen.
    8. Contractor must provide and install new water line for refrigerator.
    9. Contractor must provide and install new sprinkler system with bubblers, piping, sprinkler valve and timer to provide irrigation to four courtyard trees.
    10. Contractor must compact and prepare sub grade for new concrete pads and sidewalk.  Trim and cut back existing roots as needed.
    11. Contractor must provide and install new concrete pads and sidewalks.  Provide steel mesh concrete reinforcement and control joints.
    12. Contractor must reinstall picnic tables.

AWDED 2026-09-10 AMT 145121.00 SOL W912PP26PA027 TO COLT BUILDERS INCPlace of Performance: Kirtland AFB NM 87117 Set-Aside: 8(a) Sole Source (FAR 19.8) URL: https://sam.gov/opp/69ec8669a41b4adfa9a4c1c7fd158591/view

OutreachSystems Article Number: 20260911/AWARDS/1642
Matching keyword(s): naics!236220;