C -- Black Warrior, Tombigbee, Alabama, Coosa Rivers Project Management Office SOL W9127826RA087 DUE 09/21/2026 at 02:00PM -05:00 POC Jennifer Suit, Jennifer.H.Suit@usace.army.mil, tel:2514416466 Elizabeth Trimble, Elizabeth.M.Trimble@usace.army.mil, tel:251-690-3329This project is a Design-Build to Budget of Operations Division office building in Tuscaloosa, AL. Design and Construct facility sited along the Black Warrior River consisting of approximately 22,845 square feet. Site amenities include a visitors parking lot, secured vehicle parking, and land perimeter fencing to include gated entry. Place of Performance: Tuscaloosa, Alabama, Tuscaloosa County, AL 35404 URL: https://sam.gov/opp/08a98951fb9a4202815d6e4f71a27284/view
OutreachSystems Article Number: 20260905/PROCURE/0027