The government contract opportunities enclosed with this email are provided to you by the Nevada APEX Accelerator. This service is provided to our clients as part of government contracting assistance services. This contract opportunity notice is based upon your product/service profile. If you wish to revise your product/service profile or have questions concerning this contract opportunity, please contact the Carson City office at 775-687-9921 or the Las Vegas office at 702-486-3514.



DEPT OF DEFENSE, DEPT OF THE ARMY, W075 ENDIST SACRAMENTO, KO CONTRACTING DIVISION, SACRAMENTO CA 95814-2922


Y -- Little Mountain Testing Facility (LMTF) Progress-Design-Build OT SOL W91238269A001 DUE 05/29/2026 at 02:00PM -06:00 POC Michelle spence, michelle.a.spence@usace.army.mil Natalia Gomez, natalia.gomez@usace.army.mil

DRAFT PROGRAM SOLICITATION

For Progressive Design-Build (PDB) under Other Transaction (OT)


Project: Little Mountain Testing Facility (LMTF), Hill Air Force Base (HAFB), Utah (UT)

The U.S. Army Corps of Engineers (USACE) is issuing this DRAFT program solicitation for the design and construction of the LMTF using Progressive Design-Build under 10 USC §2808a Other Transaction for Construction.  This notice is provided for informational  purposes to allow interested parties to review the proposed acquisition approach and provide feedback prior to release of the official solicitation.  

Project Overview

Project Description

The primary goal is to construct a 50,000 sq ft facility to house expanded testing capabilities in support of the Sentinel program at the Little Mountain Testing Facility. The facility is critical for meeting future Nuclear Hardness mission requirements.

Key components of the construction include:

The new facility will house advanced testing equipment, including the Advanced Radiation Environment Simulator (ARES) and a 14 MeV neutron generator, to provide dose rate and total dose testing for parts, modules, and entire systems.

Acquisition Strategy (Pre-Award)

The USACE will use a streamlined competitive selection process: 

Award

The agreement will be awarded to the most qualified progressive design-build entity (PDBE) to provide design development, preconstruction services, and construction. Post-award Phase 1 of PDB includes Design and Pre-construction services and Post-award Phase 2 includes the final design and construction. The agreement will be Firm-Fixed-Price (FFP). The FFP for successive design and construction milestones will be agreed to as the design progresses and funds are available. 

Key Security Requirements

General Requirement and Authority

Required Level: The Government has determined that this project requires a Cybersecurity Maturity Model Certification (CMMC) Status of Level 1 (Self-Assessment). Performance under the resulting Agreement will require the handling of Federal Contract Information (FCI). Interested parties must have achieved a Final Level 1 (Self-Assessment) Status and, at the time of award, affirm completion of the required self-assessment and attestation.

Place of Performance: Hill Air Force Base UT Set-Aside: URL: https://sam.gov/opp/a71da592c34b4c0f917c22aeeccc86f2/view

OutreachSystems Article Number: 20260517/PROCURE/0011