Z -- CSS 89222 - Reseal and Stripe POV Parking Lot, Brockton MA SOL W15QKN26QA173 DUE 09/10/2026 at 02:00PM -04:00 POC Sameera Sharif, sameera.e.sharif.civ@army.mil, tel:6095627036The purpose of this Amendment is to extend the Time for submission of the Proposals. The closing date will be Thursday 10 September 2026 at 2:00pm(EDT) - Rock Island at Ft. Dix has a Construction Requirement: CSS 89222 - Reseal and Stripe POV Parking Lot, Brockton MA. Repair the cracks , resealing asphalt surfaces and restriping of parking lot lines. Place of Performance: CPL GORDON M. CRAIG USARC (MA006) 915 W. CHESTNUT STREET BROCKTON, MA. 02302, MA 02302 Set-Aside: Total Small Business Set-Aside (FAR 19.5) URL: https://sam.gov/opp/bd89cbf9e622471eb53e372d5c1b5203/view
OutreachSystems Article Number: 20260904/PROCURE/0563