|
|
Y -- FY28 KC-46A Aircraft Beddown Infrastructure Program | Altus AFB, Oklahoma SOL W912BV279A001 DUE 10/13/2026 at 02:00PM -05:00 POC Daniel Foyil, daniel.a.foyil@usace.army.mil, tel:9186697045 Julie S. Hill, julie.s.hill@usace.army.mil, tel:9186697699
The U.S. Army Corps of Engineers (USACE), Tulsa District is issuing this Request for Qualifications (RFQ) for the design and construction of the FY28 KC-46A Aircraft Beddown Infrastructure Program at Altus Air Force Base, Oklahoma using Progressive Design-Build under 10 USC 2808a Other Transaction Authority.
The KC-46A Aircraft Beddown Infrastructure Program at Altus AFB, Oklahoma, will deliver comprehensive flight-line, industrial maintenance, and advanced aircrew flight simulator training facilities necessary to support the 97th Air Mobility Wing (97 AMW) - the Department of the Air Force’s sole formal training unit for heavy mobility aircraft. This $235M consolidated capital program will modernize the installation's infrastructure to replace Eisenhower-era KC-135 operations with the next-generation KC-46A Pegasus tanker while sustaining concurrent training and maintenance for its legacy fleets.
The program will deliver three primary facility complexes along with associated airfield civil site infrastructure:
USACE will use a?streamlined?competitive selection process to select the most highly qualified design-build team:?
The agreement will be awarded to the most qualified design-build team to provide design development, preconstruction services, and construction. Post-award Phase 1 of PDB includes design and pre-construction services and Post-award Phase 2 includes the final design and construction. The agreement will be Firm-Fixed-Price (FFP). The FFP for successive design and construction milestones will be agreed to as the design progresses and funds become available.
Place of Performance: Altus AFB OK 73523 URL: https://sam.gov/opp/4a3fe7e2b8c44fa29a18d00497523d65/view OutreachSystems Article Number: 20261003/PROCURE/0121