Y -- Argon Piping Supply, Installation and Testing SOL 73573 DUE 07/27/2026 at 05:00PM -06:00 POC Jerry King, jking@fnal.gov, tel:2173901120 Susan Underwood, susanu@fnal.gov, tel:6308402021
As part of the DUNE experiment, approximately 40,000 metric tons of Argon is required to be transported from the surface to the Central Utility Cavern (CUC) at the 4850 Level. This Argon will arrive at the Ross Shaft Argon Receiving station in liquid form where it will be stored in tanks. It will then be converted to the gaseous phase, where it will be transported underground through a stainless-steel pipeline. This pipeline will be 8” diameter Schedule 10 between the Argon Receiving Facility and the Ross shaft, 6” diameter schedule 10 from Ross shaft collar to the 4850 Level, then return to 8” diameter schedule 10 from the Ross shaft to the CUC.
This SOW defined as “Argon Gas Piping Supply and Installation for LBNF” outlines the requirements for the supply, installation and testing of a stainless-steel pipeline at LBNF as described above.
Place of Performance: Lead SD 57754 Set-Aside: URL: https://sam.gov/opp/7b70391c87104e359dbb25379d3554be/view OutreachSystems Article Number: 20260603/PROCURE/0374